A construction loan funds the purchase of land and the staged build of your home under a single facility. The lender releases funds progressively as construction reaches defined stages, charging interest only on amounts drawn down at each phase.
For Perth residents buying house and land packages, understanding the mechanics of progressive drawdown, the implications of fixed price building contracts, and the timing of council approval shapes both cost and feasibility. The structure differs materially from standard home finance.
How Construction Draw Schedules Operate in Practice
The lender releases funds at five or six predetermined stages, verified by independent progress inspections. Typical stages include base, frame, lock-up, fixing, practical completion, and final handover. Each drawdown requires the registered builder to submit a claim supported by invoices for materials and labour. The lender appoints a quantity surveyor or building inspector to confirm the work matches the claim before releasing the next instalment.
Interest accrues only on the cumulative amount drawn down, not the full loan amount. During construction, most borrowers make interest-only repayments on the progressive balance. Once the build reaches practical completion, the loan converts to principal and interest repayments as a standard home loan.
Consider a buyer financing a house and land package in Baldivis. The land component is $220,000, and the construction contract is $380,000. At base stage, the lender releases funds for the land plus the first construction draw of approximately $40,000. The borrower pays interest on $260,000, not the full $600,000. By lock-up stage, cumulative drawdown might reach $400,000, and interest adjusts accordingly. This staged approach reduces interest cost during the build period, typically six to nine months for a project home on a standard block.
Fixed Price Building Contracts and Lender Requirements
Lenders require a fixed price building contract with a registered builder before approving construction finance. The contract must specify a total build cost, itemised stage payments, and a defined construction period. Cost plus contracts, where the builder charges for actual costs plus a margin, are generally ineligible for standard construction loan products.
The fixed price structure protects both borrower and lender from budget overruns. If the build costs more than anticipated, the builder absorbs the difference. If it costs less, the builder retains the margin. The contract must also nominate a commencement date, usually within three to six months of land settlement, and a completion timeframe, typically six to twelve months depending on dwelling size and complexity.
In our experience, delays in obtaining council approval or securing the building permit after contract signing can push commencement beyond the lender's allowable window. Some construction loan approvals require the borrower to commence building within a set period from the Disclosure Date, often 12 months. If council plans take longer than expected, or if the builder's schedule shifts, the loan approval may lapse and require resubmission with updated financials and valuations.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at MJ Finance and Advisory today.
Progressive Payment Schedules and the Impact on Cash Flow
The progress payment schedule dictates when the builder invoices and when the lender releases funds. Most project home builders align their payment schedules with the five or six standard construction stages. Each progress payment typically represents a percentage of the total build cost, usually 10% to 20% per stage, though this varies between builders.
The borrower does not transfer funds directly to the builder. The lender pays the builder after verifying each stage through the progress inspection. The inspection fee, often called a Progressive Drawing Fee, ranges from $250 to $500 per drawdown depending on the lender. Across six stages, this adds $1,500 to $3,000 to the total cost of the build.
Timing between stages affects how long the borrower remains on interest-only repayments and how quickly the loan balance grows. A builder who moves efficiently through frame and lock-up stages will trigger earlier drawdowns, increasing the interest-bearing balance sooner. Conversely, delays between stages mean lower interest costs during construction but extend the overall build timeline and may defer the move-in date.
When Council Approval Affects Loan Timing
The construction loan application can proceed before council approval is granted, but the loan will not settle until the development application is approved and the building permit issued. This sequence matters for buyers purchasing land separately and engaging a builder afterward, though it is less of a concern for turnkey house and land packages where the developer has already secured approvals or where the builder manages the approval process as part of the package.
For land in growth corridors such as Ellenbrook or Alkimos, council approval for a standard project home on an already subdivided lot is typically straightforward and processed within four to eight weeks. However, if the block has site-specific conditions such as bushfire zoning, significant slope, or heritage overlay, the approval process can extend to three or four months. Lenders will hold the construction loan offer open for a defined period, usually 90 days, but will not extend indefinitely without reassessing the borrower's financial position.
Failure to secure council approval within the lender's timeframe means the application expires. The borrower must reapply, providing updated income verification, updated credit checks, and in some cases a new valuation if property market conditions have shifted. This is not merely administrative. If the borrower's employment has changed or if interest rates have moved, the revised application may return a different borrowing capacity or require additional deposit funds.
Land and Construction Package Structures in Perth
A house and land package bundles the land purchase with a fixed price building contract, often through a single developer or builder. The buyer signs two contracts: one for the land and one for the construction. The land contract settles first, transferring title to the buyer and triggering the first drawdown from the construction loan. The building contract commences shortly after, subject to site works and permit finalisations.
The advantage of this structure is coordination. The developer has pre-negotiated council requirements, the builder is familiar with the estate's soil conditions and service connections, and the timeline from land settlement to practical completion is more predictable than a fragmented arrangement. For first home buyers accessing the First Home Owner Grant or stamp duty concessions, the package structure simplifies the application process because all contract details are finalised upfront.
Perth estates in areas such as Byford, Brabham, and Caversham regularly offer house and land packages with fixed build timelines of six to eight months. The construction loan approval factors in the combined land and build cost, the borrower's deposit, and any grants or concessions. The lender assesses serviceability based on the eventual principal and interest repayment, not just the interest-only amount during construction, so borrowing capacity must account for the higher ongoing repayment once the build completes.
Interest Rate Structures During and After Construction
Most construction loans begin on a variable interest rate during the construction phase, switching to either variable or fixed once the loan converts to principal and interest. Some lenders offer the option to lock in a fixed rate at the time of application, but the fixed term does not commence until the loan converts post-completion. The rate applying during construction is typically the lender's standard variable rate for owner-occupied or investment purposes, depending on the borrower's intent.
Because the borrower pays interest only on progressive drawdowns, the effective interest cost during construction is lower than a fully drawn loan. However, once the build reaches practical completion and the loan converts, the repayment increases substantially as principal repayments commence. A borrower should model the post-construction repayment amount during the application stage to confirm ongoing serviceability, particularly if household income or expenses are expected to change during the build period.
Lenders assess the construction loan application using the higher post-completion repayment figure, applying a serviceability buffer of 3% above the actual rate. This ensures the borrower can manage repayments even if rates rise after settlement. For buyers stretching their borrowing capacity, this buffer can reduce the approved loan amount compared to what they might expect from an online calculator that does not account for the buffer or the construction-specific assessment criteria.
Frequently Asked Questions
How does a construction draw schedule work for a house and land package?
The lender releases funds in stages as construction progresses, typically at base, frame, lock-up, fixing, and completion. Each stage requires an independent inspection before the next drawdown is approved. You only pay interest on the cumulative amount drawn, not the full loan amount.
Do I need council approval before applying for a construction loan?
You can apply before council approval is granted, but the loan will not settle until the development application is approved and the building permit is issued. If approval takes longer than the lender's offer validity period, you may need to reapply.
What is a fixed price building contract and why do lenders require it?
A fixed price contract specifies the total build cost, stage payments, and construction timeframe with a registered builder. Lenders require this structure to protect against cost overruns and ensure the project remains within the approved loan amount.
How do interest charges work during the construction phase?
Interest accrues only on the amount drawn down at each stage, not the full loan amount. Most borrowers make interest-only repayments during construction, then switch to principal and interest once the build reaches practical completion.
What fees apply during the construction loan process?
Lenders charge a Progressive Drawing Fee for each inspection, typically $250 to $500 per stage. Across five or six stages, this adds $1,500 to $3,000 to the total cost, in addition to standard loan establishment fees.